Superintending Engineers/Electrical - Transfers and Postings - Orders - Issued.


TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
(ABSTRACT)

Establishment  -  Class  I Service  -  Superintending  Engineers/Electrical - Transfers and Postings - Orders - Issued.

--------------------------------------------------------------------------------------------------------
 (SECRETARIAT BRANCH)

(Rt.) CMD TANGEDCO Proceedings No.4                     Dated the 16th February 2013
                                                                               Maasi  4, Nanthana
                                                                               Thiruvalluvar Aandu-2043.
PROCEEDINGS:-

          The  following  transfers  and  postings  of   Superintending Engineers/ Electrical are ordered:-

Sl.
No.
Name and Designation

       THIRUVALARGAL
Posted on Transfer
In the place of

THIRUVALARGAL
(1)
(2)
(3)
(4)
  1.  
C.Shanmugam
SE/Chennai EDC. (North)/Chennai
SE/P&A/NCTPS
Existing vacancy
  1.  
M.Ramasamy
SE/GCC-II/Chennai
SE/Kallakurichi EDC.
Existing vacancy
  1.  
J.GOLDWIN WILLIAMS
SE/Operation/NCTPS     
SE/Operation/Tirunelveli
Existing vacancy
                   
          2. The Superintending Engineers/Electrical mentioned in para-1 above are not eligible for Transfer Travelling Allowance.

          3. A report regarding the date of relief and date of joining of the officials should be sent to the Tamil Nadu Generation and Distribution Corporation Limited.  This will be apart from the Certificate of Transfer of Charge.

(BY ORDER OF THE CHAIRMAN-CUM-MANAGING DIRECTOR)

                                                                                        R.KRISHNAN
SECRETARY (Additional Charge)


To
Thiru C.Shanmugam,
Superintending Engineer/ Chennai EDC. (North)/Chennai

                                                                                                            ..2..
                                                ..2..

Thiru M.Ramasamy,
Superintending Engineer/GCC-II/Chennai

Thiru J.GOLDWIN WILLIAMS
Superintending Engineer/Operation/NCTPS     

Copy to:
The Director/Generation/TANGEDCO/Chennai            
The Director (Distribution)/TANGEDCO/Chennai
The Inspector General of Police/Vigilance/Chennai
The Legal Adviser/TANGEDCO/Chennai,
The Managing Director/TANTRANSCO/Chennai
The Director/Projects/TANGEDCO/Chennai                            
The Director/Transmission Projects/TANTRANSCO/Chennai
The Director/Operation/TANTRANSCO/Chennai,
The Chief Engineers/TANGEDCO/TANTRANSCO
The Director/Finance/TANGEDCO/Chennai.
The Director/Finance/TANTRANSCO/Chennai.
The Chief Financial Controller/General/TANGEDCO/Chennai
The Chief Financial Controller/TANTRANSCO/Chennai.
The Chief Financial Controller/Revenue/TANGEDCO/Chennai
The Chief Financial Controller/Regulatory Cell/TANGEDCO/Chennai
The Superintending Engineer/Chairman Cum Managing Director’s  Office.
The Superintending Engineer/Chennai EDC. (North)
The Superintending Engineer/GCC-II/Chennai
The Superintending Engineer/Operation/NCTPS
The Superintending Engineer/P&A/NCTPS
The Superintending Engineer/Kallakurichi EDC.
The Superintending Engineer/Operation/Tirunelveli
The General Manager/Human Resource Development/Chennai.
The Superintending Engineer/Computer Centre, 
The Chief Internal Audit Officer
The Deputy Secretary/Personnel,
The Chief Public Relations Officer.                      
The Under Secretary/Services/Secretariat Branch                   
The Under Secretary/General/Secretariat Branch                   
The Private Secretary to Chairman Cum Managing Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A15, A20, A22, A23 and A25 Sections/Secretariat Branch

                           
                        // TRUE COPY : : FORWARDED : : BY ORDER  //


                                                                             SECTION OFFICER

TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
(ABSTRACT)

Establishment  - Class I Service  -   Superintending   Engineers/Electrical - Promotion and Postings - Orders - Issued.
--------------------------------------------------------------------------------------------------------
(SECRETARIAT BRANCH)

(Per.) CMD TANGEDCO Proceedings No.39                Dated the 16th  February, 2013    
                                                                            Maasi  4, Nanthana  
                                                                            Thiruvalluvar Aandu-2043.

                                                                           READ:-

(Per.) CMD TANGEDCO Proceedings No.251, (SB) dated 21.11.2012.
******
PROCEEDINGS:-

Under  regulation  92 of the Tamil  Nadu Electricity  Board Service  Regulations read with the Tamil Nadu Electricity (Re-organisation and Reforms) Transfer Scheme 2010,  the  following   6  (Six Only)  Executive Engineers/ Electrical  are  regularly promoted and  appointed  as Superintending  Engineers/ Electrical in  Class-I  (Division-III, Category-I)  of Tamil Nadu Generation and Distribution Corporation Limited Service with  effect from the date of assumption of charge:-

                                              THIRUVALARGAL:-
1.
S.SANTHI
2.
A.PANCHALINGAM
3.
P.RANI
4.
N.NARAYANAN
5.
R.SIVARAJU
6.
V.RAJENDRAN

          2.  The  following  postings  of  Superintending  Engineers/Electrical are ordered:-  

Sl.
No.
Name and Designation

THIRUVALARGAL
Posted on Promotion
In the place of

THIRUVALARGAL
(1)
(2)
(3)
(4)
  1.  
S.SANTHI
EE/General/Coimbatore
Coimbatore EDC. (Metro)
SE/Udumalpet EDC.
Existing vacancy


                                                                                                                  ..2..
                                                          ..2..

Sl.
No.
Name and Designation

THIRUVALARGAL
Posted on Promotion
In the place of

THIRUVALARGAL
(1)
(2)
(3)
(4)
  1.  
A.PANCHALINGAM
EE/PH/Navamalai
O/o.SE/Generation Circle/Kadamparai

SE/GCC-I/Chennai
Existing vacancy
  1.  
P.RANI
EE/Electrical/Purchase
O/o.CE/Distribution/
Chennai Region/
(South)
SE/Transmission-IV/
Chennai
In the newly created post issued in (Per.) FB TANGEDCO Proceedings No.  70 (SB) dated 13.12.2012

  1.  
N. NARAYANAN
EE/Electrical
(On deputation with CMRL)
SE/Electrical
(On deputation with Chennai Metro Rail Limited/Chennai)
His services are placed at the disposal of Chennai Metro Rail Limited/ Chennai

  1.  
R. SIVARAJU
EE/O&M/
Virudhachalam
Cuddalore EDC.

SE/Operation/NCTPS
J.Goldwin Williams
SE/Electrical transferred
  1.  
V. RAJENDRAN
EE/Generation/Shift/MTPS

SE/Electrical/NCTPS Stage-II (2X600 MW)
Existing vacancy

          3.  The  Chief Engineers/Superintending Engineers  concerned are  requested  to  relieve  the officials  under orders of promotion and postings immediately  by making  local  arrangements without waiting for  substitutes  and instruct  them to join at the new post before the expiry  of  joining time.  A report should be sent to the Tamil Nadu Generation and Distribution Corporation Limited regarding the date of relief and date of joining of the said officials.  This will be apart from the Certificate of Transfer of Charge.                 

         

                                                                                                                ..3..
                                                          ..3..

          4.  An  option  format is enclosed  herewith.  The  officials mentioned  in  para-1 above are requested to  return  the  option format duly filled in within one month from the date of promotion and assumption of charge.  If  the  option format
is not received within   the  said  period of one month, their pay in the  higher post   will   be  fixed  as  specified  in  para-3   of   Board's Memo. No.75406/P1/90-1, dated 19.3.1991.


(BY ORDER OF THE CHAIRMAN CUM MANAGING DIRECTOR)


                                                                                       R.KRISHNAN
SECRETARY (Additional Charge)

To
Tmty. S.SANTHI, Executive Engineer/General/Coimbatore
Through:- The Superintending Engineer/Coimbatore EDC. (Metro)

Thiru A.PANCHALINGAM, Executive Engineer/PH/Navamalai
Through:- The Superintending Engineer/Generation Circle/Kadamparai

Tmty. P.RANI, Executive Engineer/Electrical/Purchase
Through:- The Chief Engineer/Distribution/Chennai Region/South

Thiru N. NARAYANAN, Executive Engineer/Electrical (On deputation with CMRL)
Through:- The The Managing Director/Chennai Metro Rail Limited
         "Harini Towers" No.7, Conron Smith Road, Gopalapuram, Chennai-86

Thiru R. SIVARAJU, Executive Engineer/O&M/Virudhachalam
Through:- The Superintending Engineer/Cuddalore EDC.
Thiru V. RAJENDRAN, Executive Engineer/Generation/Shift/MTPS
Through:- The Superintending Engineer/P&A/MTPS

Copy to:
The Director/Generation/TANGEDCO/Chennai            
The Director (Distribution)/TANGEDCO/Chennai
The Managing Director/Chennai Metro Rail Limited
         "Harini Towers" No.7, Conron Smith Road, Gopalapuram, Chennai-86
The Inspector General of Police/Vigilance/Chennai
The Legal Adviser/TANGEDCO/Chennai,
The Managing Director/TANTRANSCO/Chennai

                                                                                                                ..4..
                                                           ..4..

The Director/Projects/TANGEDCO/Chennai                            
The Director/Transmission Projects/TANTRANSCO/Chennai
The Director/Operation/TANTRANSCO/Chennai,
The Chief Engineers/TANGEDCO/TANTRANSCO
The Director/Finance/TANGEDCO/Chennai.
The Director/Finance/TANTRANSCO/Chennai.
The Chief Financial Controller/General/TANGEDCO/Chennai
The Chief Financial Controller/TANTRANSCO/Chennai.
The Chief Financial Controller/Revenue/TANGEDCO/Chennai
The Chief Financial Controller/Regulatory Cell/TANGEDCO/Chennai
The Superintending Engineer/Chairman Cum Managing Director’s  Office.
The Superintending Engineer/Coimbatore EDC. (Metro)
The Superintending Engineer/Generation Circle/Kadamparai
The Superintending Engineer/Cuddalore EDC.
The Superintending Engineer/P&A/MTPS
The Superintending Engineer/Udumalpet EDC.
The Superintending Engineer/GCC-I/Chennai
The Superintending Engineer/Transmission-IV/Chennai
The Superintending Engineer/Operation/NCTPS
The Superintending Engineer/P&A/NCTPS
The Superintending Engineer/Electrical/NCTPS Stage-II (2X600 MW)
The General Manager/Human Resource Development/Chennai.
The Superintending Engineer/Computer Centre, 
The Chief Internal Audit Officer
The Deputy Secretary/Personnel,
The Chief Public Relations Officer.                     
The Under Secretary/Services/Secretariat Branch                   
The Under Secretary/General/Secretariat Branch                   
The Private Secretary to Chairman Cum Managing Director/Secretary
Administrative Branch
Computer Centre
Vigilance Cell.
A2, A5, A15, A20, A22, A23 and A25 Sections/Secretariat Branch

                           
                        // TRUE COPY : : FORWARDED : : BY ORDER  //